Clear scope. Useful deliverables.
Translate electrical drawings and schedules into organized device, distribution and routing quantities.
Trade scope and measurement
- Lighting, devices and equipment counts
- Panels, feeders, conduit and cable allowances
- Low-voltage scope and system interfaces
The trade package starts with the relevant plans, details and specifications. Quantities are separated by system, assembly or work area so the scope can be reviewed without losing the connection to the source drawings. Measurement units and exclusions remain visible throughout the package.
Coordination with adjacent work
Construction trades share interfaces. Openings, supports, penetrations, access and finishing boundaries can affect what each contractor includes. We record these interfaces and flag items requiring clarification rather than assuming that another trade has covered them.
Pricing and procurement support
A quantity schedule can support supplier enquiries, subcontractor quote comparisons or a priced bid. Tell us whether material, labor and equipment allowances belong in your package. Local supplier quotes and installation assumptions can be incorporated when available, with their basis identified for review.
Addenda and changes
Issue the latest addenda with your request. For revisions, provide the previous and current drawing issues so changed scope can be identified. The update boundary and intended output are agreed before the revised package is prepared.
Start your trade estimate
Contact our team with the project location, required work areas and submission date. You can also use Get a Quote to upload your plans privately. We will confirm the document requirements, deliverables and scope before work begins.
What’s included
- Lighting, devices and equipment counts
- Panels, feeders, conduit and cable allowances
- Low-voltage scope and system interfaces
A few things you might ask.
Can this trade be estimated separately?+
Yes. Confirm the work areas, systems and exclusions you need, and send the relevant drawings and details.
What happens if details are missing?+
Missing details are recorded as clarifications or explicitly stated allowances. They are not presented as confirmed quantities.


